
The service of the service service in the phase and OMR near the VHS hospital in Taramani will soon be improved by Tamil Nadu Road Development Company (TNRDC).
“Since there is quite a lot of pedestrians, we create a new walking journey near the line of season boxes that separates the main road from the lane. We remove the interconnected bricks and place the upper part of the tar.
Students from nearby educational institutions and patient participants use this section to achieve a bus booth at Sardar Patel Road. “The surface is uneven and makes it difficult to ride or walk, especially at night. Some lighting could be provided,” Surender suggested, regular commuting.
The work is expected to start soon. Four trees, including two Banyans that existed before the road lay down, will be preserved. The surrounding cement structure will be neatly restored, reflective stickers glued and a layer BT laid from the wall of the hospital.
A new opening of the main road will be provided just before the start of a row of trees, so that heavy vehicles can connect to the road. A barrier will be built on the service lane, so it can only be used by cars, ambulances, autorickshaws and two -round wheels. Lighting will also be provided, explained the engineer associated with the project.
Meanwhile, the TNRDC removed the design residues from the sidewalks to the SRP intersection. “People used space to throw out garbage forcing pedestrians to use the road. We strengthen the patrol in this area,” the clerk said.
Published – April 10, 2025 21:57