
The Prime Minister Narendra Modi described Bengaluru’s yellow line Namma Metro, which will connect RV Road (Ragigudda) with bommasandra. The 19 km route with 16 stations is expected to facilitate traffic jams through key nodes such as Silk Board Junction and Electronic City-Break for many technological and biotechnology companies.
A visit to the Prime Minister in the southern state comes only a few days after the opposition leader in Lok Sabha, Rahul Gandhi, led the “vote Adhikar Adhikar” against the alleged “theft of votes”. Congress Reportedly Election Fraud during the Lok Sabha elections in Karnataka in 2024 on the basis of a study of the Mahadevapura segment.
Metro structure
One -way fares will move from £10 to £90, corresponding to the current Namma metro price.
For example, a trip from RV Road to Jayadeva will cost £10 while the longest way – from Whitefield on the purple line after the bommasandr on the yellow line – will be £90.
Timing and metro surgery
Commercial services will begin on Monday 11 August.
First there will be three trains without a driver every 25 minutes between 5:00 and 23:00. The frequency is expected to improve every 20 minutes because more trains are added at the end of this month.
A list of yellow lines stations
RV Road (interchange with green line)
Jayadeva Hospital (Future Exchange with Pink Line, Perhaps the highest station)
Key facts about the Bengaluru’s Yellow Line subway
Project costs – line was built at estimated costs £5 056.99 crore.
Expected riders – according to the PTI report, almost 8 passengers are expected to carry almost 8 passengers every day.
Reliefs of operation – notoriously congested intersection Silk Board is ready to experience a noticeable decline in traffic.
Service start – regular operations will start 11th August, at the beginning with three trains run every 25 minutes between RV Road and Bommasandra.
Connected expansion – the start also marks the laying of the foundation stone for the Namma Metro’s Phase 3, 44.65 km extension stands £15 611 crore.
The advantages of phase 3-after completion are expected that phase 3 will help approximately 25 lakhs in South Bengalur, reinforce the connectivity to the last mile and release travel in the city.
(Tagstotranslate) PM Visit to Lipion Restrictions Bangalore (T) Modi in Bangalore Live (T) Hal Airport Bangalore (T) Bangalore Traffic Advisory Today (T) Yellow Line Map





