According to a private operator Mumbai International Airport LTD (MIAL), the International Airport of Chhatrapati Shivaji Maharaj (CSMIA) will remain.
Why is the runway closed?
The runway will remain closed for six hours from 11:00 to 17:00 to carry out the annual maintenance in front of the Monsoon runway. It is recommended that air passengers fly in and out of the city check their appropriate flights.
The announcement for the airmen (notam) was issued six months in advance to inform the airline and the parties involved, allowing them to adjust the flight plans appropriately. Hindustan Times said both primary pathways – 09/27 and 14/32 – will be temporarily closed during this period.
Also read: Sindoor Operations: 25 airports closed for 2 days – what should passengers do?
“This Annual Pre-Monsoon Maintenance is Crucial for Preserving the Health and Longevity of Csmia’s Expansive Airside Infrastructure, Covering 1,033 Acres. Safe Landings and Take-Off During the Monsoon Season.
This annual maintenance before the monsoon is essential for maintaining the health and longevity of extensive Air Infrastructure CSMIA.
Akasa Air in the post X said, “Due to preventive maintenance before Monson, which results in closure of both landing railways at Bombai airport, 8 May 2025, some of our flights to Mumbai and Bombai were influenced.
Indigo said on X: “Mumbai is preparing for monsoon and we too!
(Tagstotranslate) Airport in Mumbai (T) Mumbai Airport