
Hyderabad
The Committee on the Evaluation of the Ministry of the Environment, Forest and Climate Changes in the River and Hydroelectric Project Valley has returned the design of the Polavaram-Banakacacherla Link Project (PBLP) project, which made Andhra Pradesh to issue reference conditions for its evaluation because it concerns linked questions.
Several statements sent by the MOEF and letters that the TELANGANA government addresses to the Ministry of Jala, MoEf and the CWC Commission (CWC), which emphasizes that the AP proposal would be a violation of the Godavari water disputes, and includes essential issues that have an impact on the EAC meeting.
In the EAC sessions issued on Monday, the Panel of an expert on the project proposal, the Government, etc. It is necessary to approach the CWC for the latter to investigate interstate questions and grilles of the necessary permits/authorization before submitting the proposal for its assessment for its assessment “.
The EAC recommended that the project proposer to consult with CWC assumes a comprehensive evaluation of the availability of flood water. The Theangany government in its letters addressed by CWC, Mojs and others claimed that the AP proposal would violate the coastal rights of Telangans in the Godavari basin because the lower state of coastal plans planned to divert a huge amount of water, 200 TMC FT per year.
According to the proposal submitted by AP, PBLP has a supply of drinking water on the road about 80 lakh populations on the road, creating 3 lakh hectares (more than 7.41 lakh acres) of new Ayacut, stabilization of 9.14 Lakh hectares (almost 22,59 lakh acres) Ayacut and 20 TMC FT. It would also create 400 megawatt hydro-power.
The AP government gave project costs of 81,900 GBP Crore and also includes immersion/displace of 24,062 hectares (59,459 acres), of which 16,883 ha. (41 719 acres) private land and 7 179 ha. (17 740 acres) forest soil. In addition, the main proposed tanks would immerse another area of 39 218 acres for water storage.
EAC noted that the proposed project aims to avert the flood water from the Godavari River Basin (dam) to the water deficiency in AP in AP and observed that the environmental clearance (EC) for Indira Sagar Polavaram is still related to the underground and printing project and They suppressed the frightening and telangan, and Telllangana, and Testingan and Dot, and are suppressed in Oda and Telangana, and during Odisha, and Telangana, and in the Odisha area, and Telangana, and in the area of Odisha and Telangana.
Published – June 30, 2025 21:26