The upgraded Karimnagar-Warangal section of NH 563 is to boost tourism and trade in the region

The upgraded 68-km stretch of Karimnagar-Warangal National Highway-563 (NH-563) is all set to transform connectivity along the corridor, with the four-lane stretch expected to reduce travel time, facilitate smoother movement and boost tourism and economic activity.

With about 99% of the work completed, the upgraded section is awaiting inauguration, with only miscellaneous work remaining, official sources said.

The section from Manakondur bypass near Karimnagar to Palivelpula near Hanamkonda was four-lane at an estimated cost of ₹2,414 crore.

The upgrade is expected to reduce the travel distance by around 11 km and reduce the journey time from around 90 minutes to almost 50 minutes.

In addition to reducing the movement of motorists, the upgraded highway is designed to facilitate faster transportation of agricultural products to markets, strengthen regional logistics and improve connectivity between key commercial and industrial centers.

The improved connectivity is also expected to benefit pilgrims and tourists traveling to major pilgrimage and cultural destinations including the Sri Raja Rajeshwara Swamy Temple in Vemulawada, Sri Matsya Girindra Swamy Temple in Kothagattu, the historic Bhadrakali Temple, the Thousand Pillar Temple and the Warangal Fort.

It will also enhance connectivity to important textile and granite hubs in the region.

The project includes an advanced traffic management system for real-time monitoring and incident management, as well as a 24×7 Command and Control Center for integrated emergency monitoring and response.

Published – 15 Sep 2026 0:45 AM IST